GCS-II Switchgear is a low-voltage withdrawable assembly for power distribution and motor-control circuits. Select the functional units, main and auxiliary supplies, busbar ratings and circuit duties as one coordinated configuration.
GCS-II Switchgear Specifications
Electrical Ratings
| Parameter | Unit | Specification |
|---|---|---|
| Main circuit rated voltage | V AC | 380 / 400 / 660 |
| Auxiliary circuit rated voltage | V AC | 220 / 380 / 400 |
| Auxiliary circuit rated voltage | V DC | 110 / 220 |
| Rated frequency | Hz | 50 / 60 |
| Rated insulation voltage | V | 660 / 1000 |
| Horizontal busbar rated current | A | ≤ 4000 |
| Vertical busbar rated current | A | 1000 |
| Busbar short-time withstand current (1 s) | kA | 50 / 80 |
| Busbar peak withstand current | kA | 150 / 176 |
| Main circuit power-frequency test voltage | V | 2500 |
| Auxiliary circuit power-frequency test voltage | V | 2000 |
| Degree of protection | IP | IP30 / IP40 |
Service Conditions
| Parameter | Condition |
|---|---|
| Maximum ambient temperature | +40 °C |
| 24-hour average temperature | ≤ +35 °C |
| Relative humidity | ≤ 50% at +40 °C; up to 90% at +20 °C |
| Altitude | ≤ 2000 m |
| Installation inclination | ≤ 5° from vertical |
| Installation environment | No severe vibration, impact or conditions that corrode electrical components |
Available ratings depend on the selected configuration. Provide the single-line diagram, load schedule, system voltage and prospective short-circuit current for selection.
Selection questions for GCS-II
When should a project specify withdrawable units?
Define the outgoing circuit duties, planned maintenance approach and spare-unit requirements. Confirm unit sizes, connection positions, interlocks and handling access for the offered assembly. Withdrawability alone does not establish uninterrupted operation or permission for live replacement.
How should it be compared with fixed switchgear?
Compare equivalent circuit duties, ratings, protection and environmental conditions. GGD fixed switchgear is a different construction example; the fixed versus withdrawable guide sets out the purchasing questions without assuming the two series are interchangeable.
Use the industrial application requirements to define the load schedule. Agree the FAT records and witness scope and include them with the quotation inputs.