——Delivered Projects · Western China

Seven power projects across six industries.

A documented portfolio of delivered electrical infrastructure in western China — residential communities, hyperscale data centers, thermal generation, gas stations, civil airports, tertiary hospitals and smart industrial campuses. Each case below is built from real project data.

PORTFOLIO SNAPSHOT

7projects / 6industries / 30k+m²built-up / 20.5+ MVA installed

All projects

All

Park-side Residential Distribution

Electrical distribution for a 1,828-unit community on 175 mu, with dual-source ATSE for fire-critical loads and a 10/0.4 kV substation network


Commercial buildings

Sichuan Big Data Center — Tier III+ Campus

3,000+ cabinets across 30,000 m², dual independent utility feeds, full 2N switchgear and selective protection from 10 kV intake to PDU.


Data centers

Gaoba 100 MW Thermal Unit

6 kV vacuum-breaker switchgear in withdrawable cabinets for a 100 MW CFB unit — full DCS integration and “five-prevention” safety interlocks.


Power Plants & Substations

Chuanyou Natural Gas Technology Park

CNG/LNG station electrical infrastructure on a 100-mu gas technology park — 10 kV intake to box-type substations, dry-type transformers, dual-source backup for fire and PLC controls.


Oil & Gas

Wuliangye Airport — 4C Airfield

3,000+ cabinets across 30,000 m², dual independent utility feeds, full 2N switchgear and selective protection from 10 kV intake to PDU.


Public Infrastructure

People’s Hospital — Class III Tier A

Dual-circuit + dual-source scheme pioneered in Liangshan Prefecture, with imported diesel backup for surgery, ICU and ER — a regional benchmark for hospital reliability.


Public Infrastructure

Renhuai Sauce-aroma Winery — Smart Campus

IoT-enabled winery with a 300,000-tonne smart liquor vault, drone patrol and integrated low-voltage systems across bottling, storage and a 4.7-rated hotel.


Industrial & Metallurgy

——Your Project, Next

Let’s add your site to this list.

Share your project brief — we’ll respond with a technical proposal and indicative timeline within one business day.